Sidewalk repair postponed to May 4-5, 2017

Sidewalk repair postponed to May 4-5, 2017


The Association will be undertaking a project that residents need to be made aware of. We will, on May 4-5, 2017, be removing certain areas of sidewalk and pouring new concrete. The schedule, weather permitting, is for removal and pouring to occur on the 5/4 and stripping of forms and clean up on the 5/5. Residents are being asked to avoid these areas and to keep children and pets away until cleanup has occurred. No driveway aprons will be affected and this will have little to no impact on parking except during the time when men are on site working.


The general areas affected are on the following streets:

  • Paddington Station Terrace

  • Wembley Central Terrace

  • Brondesbury Park Terrace

  • Willesden Terrace